The goal of this project is to conduct measurements and assess sedimentation scale at the Ruslovoye Reservoir of the Tuyamuyun Hydro Complex, carry out sedimentation forecast calculations, and elaborate recommendations for optimizing the reservoir’s operation regimes to diminish sedimentation based on innovative solutions in terms of utilizing sediment deposit materials. The exercise aimed at designing and proposing enhanced operation regimes for the TMHC reservoir system to eliminate the negative consequences of disrupted natural channel regime of the lower Amu Darya River, including to improve water intake into irrigation canals, bring down filtration water losses, as well as boost agricultural productivity.