Navoi Scaling Solar Independent Power Producer Project (P170598)
The objective of the Navoi Scaling Solar Independent Power Producer IPP Project for Uzbekistan is to increase and diversify electricity generation capacity through private investment in Uzbekistan The proposed project will be the country s first competitively selected private investment
Electricity Sector Transformation and Resilient Transmission (P171683)
The Project Development Objectives PDO are to i strengthen the performance of the National Electricity Grid of Uzbekistan NEGU and ii improve the capacity and reliability of the power transmission system to integrate large scale renewable energy sources The Project
Clean Energy for Buildings in Uzbekistan (P176060)
The Project Development Objective PDO is to improve energy efficiency in public buildings and enhance the regulatory framework for clean energy investments in the buildings sector The project has three components a clean energy investments in public buildings b TA
Uzbekistan Dzhankeldy WPP
The project is to finance the development design construction and operation of the 500 MW Dzhankeldy WPP as well as associated 500 kV overhead transmission lines located in the Peshku district Bukhara region of Uzbekistan
The pilot wind
Uzbekistan Bash WPP
The project finance basis to finance the development design construction and operation of the 500 MW Bash WPP as well as associated 500 kV overhead transmission lines located in the Gijduvon district Bukhara region of Uzbekistan
The project
Climate Risk Manageent
The project aims to strengthen institutional capacity and cross border cooperation among Central Asian countries The programme contributes to the nationally agreed Sustainable Development Goals on climate change adaptation SDG 13 and peace and security SDG 16
The