Navoi Scaling Solar Independent Power Producer Project (P170598)
The objective of the Navoi Scaling Solar Independent Power Producer IPP Project for Uzbekistan is to increase and diversify electricity generation capacity through private investment in Uzbekistan The proposed project will be the country s first competitively selected private investment
Electricity Sector Transformation and Resilient Transmission (P171683)
The Project Development Objectives PDO are to i strengthen the performance of the National Electricity Grid of Uzbekistan NEGU and ii improve the capacity and reliability of the power transmission system to integrate large scale renewable energy sources The Project
Additional Financing to Nurek Phase 2 (P177609)
Component 1 Rehabilitation of six generating units and other key infrastructure and purchase of machinery required for maintenance of the power plant Component 2 Technical assistance This component will support the implementation of the project and strengthen the institutional capacity
Clean Energy for Buildings in Uzbekistan (P176060)
The Project Development Objective PDO is to improve energy efficiency in public buildings and enhance the regulatory framework for clean energy investments in the buildings sector The project has three components a clean energy investments in public buildings b TA
Chakan GES Modernization
The Project is to finance the reconstruction and rehabilitation of small hydro power plant 8220 HPP 8221 units owned by Chakan GES a local power plant operation with a total installed capacity of 38 5 MW fully owned subsidiary of
Uzbekistan Dzhankeldy WPP
The project is to finance the development design construction and operation of the 500 MW Dzhankeldy WPP as well as associated 500 kV overhead transmission lines located in the Peshku district Bukhara region of Uzbekistan
The pilot wind